Material | Q235,Q345 |
---|---|
Surface Treatment | Hot Dipped Galvanized |
Specification | M48, M60 |
Certificate | CE SGS |
Packaging Details | steel pallet |
Material | Q235B,Q345B |
---|---|
Certificate | CE SGS |
Standard | AS 1576.3 |
Packaging Details | Packed with steel pallet |
Delivery Time | 20-35 days |
Material | Q235B,Q345B |
---|---|
Certificate | CE SGS |
Standard | AS 1576.3 |
Packaging Details | Packed with steel pallet |
Delivery Time | 20-35 days |
Material | Q235B |
---|---|
Certificate | CE SGS |
Standard | AS 1576 |
Packaging Details | Packed with steel pallet |
Delivery Time | 20-35 days |
Material | Q235B,Q345B |
---|---|
Certificate | CE SGS |
Standard | AS 1576.3 |
Packaging Details | Packed with steel pallet |
Delivery Time | 20-35 days |
Material | Q235B |
---|---|
Certificate | CE SGS |
Standard | AS 1576.3 |
Packaging Details | Packed with steel pallet |
Delivery Time | 20-35 days |
Material | Q235B,Q345B |
---|---|
Certificate | CE SGS |
Standard | AS 1576.3 |
Packaging Details | Packed with steel pallet |
Delivery Time | 20-35 days |
Features | Easy To Assemble And Disassemble, High Strength And Stability |
---|---|
OD | 58mm, 70mm |
Application | Construction/Building/Infrastructure |
Surface Treatment | Hot-dip Galvanized |
Material | Q235B |
Material | Q235B |
---|---|
Certificate | CE SGS |
Standard | AS 1576 |
Packaging Details | Packed with steel pallet |
Delivery Time | 20-35 days |
Material | Q235B/Q345B |
---|---|
Standard | AS 1576.3 |
Certificate | CE SGS |
Packaging Details | Packed with steel pallet |
Delivery Time | 20-35 days |